- The CBO estimates the Navy’s 2027 shipbuilding plan would cost roughly $54 billion annually in 2026 dollars.
- The plan would expand the fleet from 286 ships to 398 by 2056.
- The CBO’s annual estimate is 18% higher than the Navy’s analysis.
- Maintenance delays and munitions demands could complicate the Navy’s effort to field the expanded fleet.
The Navy’s 2027 plan to expand its fleet over the next 30 years would carry an annual cost of roughly $54 billion in 2026 dollars, according to a Congressional Budget Office report released Thursday. That estimate is 18% higher than the Navy’s own analysis.
The financial gulf highlights the steep price of growing the fleet while buying new combat ships, support vessels and unmanned systems. The CBO examined the broader financial implications of the Navy’s ambitious shipbuilding blueprint.
“CBO estimates that the Navy’s 2027 plan would cost 41% more annually in real terms (that is, with costs adjusted to remove the effects of inflation) than the average amount appropriated over the past 5 years,” the report said.
Under the plan, the Navy would increase the fleet from 286 ships to 398 by 2056. If completed, the expansion would create the largest Navy fleet since 2001.
The service would purchase 371 new combat ships and combat logistics and support ships. It also would obtain 58 new auxiliary ships, 29 used auxiliary ships, 72 medium unmanned surface vessels and 15 nuclear-powered guided missile battleships.
Building the new ships alone would cost an average of $48.9 billion annually, according to the CBO. The Navy estimated that the same construction effort would cost $41.1 billion per year, leaving a sizable difference between the two projections.
The CBO calculated that annual construction costs under the 2027 plan would be 21% higher than the annual cost associated with the Navy’s 2025 shipbuilding plan. That increase adds another layer of fiscal pressure to an already expensive expansion.
According to the agency, ships are taking longer and proving more difficult to build than expected. Elaborate ship designs, inaccurate initial cost estimates and the introduction of the Navy’s Trump-class battleship program contributed to the larger projected price tag.
FREE Gun Law Map: Laws Don't Pause During Social Unrest
The CBO estimated that the Navy also would spend another $4.6 billion annually on ships and related work not included in the 2027 blueprint. The plan covers only new construction for battle force ships, leaving other costs outside its stated boundaries.
That additional money would pay for refueling nuclear-powered ships, outfitting new ships and procuring vessels that fall outside the battle force category. Combined with new construction, those expenses push the expected annual total to around $54 billion.
Money is not the Navy’s only obstacle. The report warned that maintenance delays that have plagued the service for more than a decade could prevent it from wielding the full offensive capabilities of the expanded fleet unless those problems are addressed.
Extended deployments involving ships such as the USS Abraham Lincoln, USS Gerald R. Ford and USS Spruance during the Iran war affect vital maintenance availability windows. Those disruptions prolong the period before the ships can become deployable again.
The shipbuilding plan also calls for greater numbers of missile launchers. Meeting that demand would require a massive investment in the military’s munitions stockpile, which has taken a hit since the Iran war began.
The CBO cast doubt on whether the Navy could afford the plan without an enormous increase in annual funding. Even recent funding levels, which the agency described as the highest since the 1980s, would not be sufficient.
“Even if the service received annual funding for shipbuilding from 2027 to 2056 that equaled the amount of such funding that it received in each of the past five years — a half-decade during which that funding was at its highest level since the 1980s — the service still could not afford to buy all the ships in its 2027 shipbuilding plan,” the report said.
The DoW submitted the fiscal 2027 shipbuilding plan to Congress on May 11. The proposal offers a path toward a substantially larger fleet, but the CBO’s analysis presents a daunting bill, persistent maintenance constraints and serious questions about whether current funding can support the Navy’s ambitions.
The opinions expressed by contributors and/or content partners are their own and do not necessarily reflect the views of BoredTrashPanda.com. Contact us for guidelines on submitting your own commentary.